Hwy 20 and Hamby/Ward Roundabout Project (ODOT)

Updates on the Hwy 20 Hamby/Ward Roundabout:

Hwy20 Hamby/Ward Roundabout Update -5/06/22

By Mike Whitter | May 6, 2022

US 20: Ward-Hamby Road Intersection Project (Bend Area) –

The ODOT US 20 Ward/Hamby roundabout is open to traffic as of May 7. Hamby Road is also open to traffic between US 20 and Neff Road, but Ward Road will remain closed through May 20. Ward Road is closed between US 20 and Bear Creek Road. A designated detour route is in place between US 20 and Torkelson Road. Intermittent road work may still be occurring on Hamby Road between US 20 and Neff Road. Road users should expect delays during work hours.

Hwy20 Hamby/Ward Roundabout Update -4/22/22

By Mike Whitter | April 23, 2022

ODOT Region 4 Weekly Construction Update – April 25 – 29, 2022

U.S. 20: Ward/Hamby Rd. Intersection Project (MP 3.26 – MP 3.86)

ODOT will construct a single-lane roundabout at the intersection of U.S. 20 and Ward/Hamby roads.

The Contractor will have a full road closure of Hamby Rd. at US20 and a full road closure of Ward Rd. at US20 the closure will be in effect until April 29th. Please use alternate route during this closure a detour route will be posted. All US20 traffic will be placed on the new roundabout but the Hamby Rd and Ward Rd access legs will still be closed. Please expect delays.

Project Page

Hwy20 Hamby/Ward Roundabout Update -4/01/22

By Mike Whitter | April 1, 2022
U.S. 20: Ward/Hamby Rd. Roundabout Project (MP 3.26 – MP 3.86)
The Contractor will have a full road closure of Hamby Rd. at US20 and a full road closure of Ward Rd. at US20. The closure will be in effect until April 26th. Please use alternate route during this closure a detour route will be posted. Also, US20 will be reduced down to a single lane and the area will be controlled with 24 hour flagging to get traffic through the workzone. Please expect delays.

Sign up for Road Work News!

Interested in getting the latest news on traffic alterations around town?